EasyManua.ls Logo

Olimpia splendid Unico EDGE - 2.4.1 - Drilling the Wall

Olimpia splendid Unico EDGE
270 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN - 16
ENGLISH
2.4 - UNIT ASSEMBLY
The maximum allowed length of the pipes is 1 m, the pipes must be internally smooth, with a di-
ameter equal to 202 mm or 162 mm and bends cannot be performed.
It is necessary to use the grilles provided, or grilles which keep the same features.
2.4.1 - Drilling the wall
Installtheunitbydrillingtwoholes(diameterofeither162mmor202mm)inthewallasindicatedinthe
drilling template.
The 202-mm holes will ensure best performance and utmost noiselessness.
• ItispossibletoinstalltheunitUNICOEDGEinsteadofaunitUNICOSKYorUNICOSTARwithout
modifyingthealreadyexistingholes,exceptionmadeforthesmallcondensationdrainhole.
Inthiscase,inordernottopenalizeperformances,removetheinsulatingmaterialpossiblypresentin
theairexpulsionhole.Theanchoringbracketsneednewdrillingtoo.
• Drillthewallusingthepropertoolstofacilitateyourjobandpreventexcessdamageordisturbanceto
yourclient.
Thebesttoolsfordrillinglargeholesinwallsarespecialdrillscalledcoreborerswithveryhightwisting
torqueandadjustablerotatingspeeddependingonthediameteroftheholetobedrilled.
• Topreventthecreationoflargeamountsofdustandrubbleduetodrilling,thecoreborercanbetted
withavacuumsystemappliedbymeansofsuctioncupstothedrillingzone.
• Todrilltheholes,proceedasfollows:
- Placethesupplieddrilljig(M)againstthewallobservingtheminimumdistancesfromtheceiling,
theoorandfromthesidewallsindicatedonthejigitselfwhichcanbekeptinthecorrectposition
usingadhesivetape(Y)(g.4).
- Useasmalldrillorpunchtomark,withextremecare,theexactcentreofeachoftheholestobe
drilled(g.4).
- Usingacoreboringheadmeasuringatleast202mm(or162mm)todrillthetwoholesforentryand
exitoftheair.
Drill the foregoing holes tilted slightly downwards to prevent water from being fed back through
the ducts (g. 5).
Most of the removed material is expelled outwards, therefore make sure that it
does not hit any person or object when it falls out.
In order to avoid as much as possible outer plaster breaking, it is necessary to
proceed carefully with the last part of hole execution, decreasing pressure on
core borers.

Table of Contents

Related product manuals