EasyManua.ls Logo

OLT GH88 - Roof Frame and Panel Installation; Poly Panel Insertion; Door Header and King Stud Installation

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Outdoor Living Today www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 17
11. Position Door Header on both the Front and Rear Center Posts. Using 1 - 7 1/4” Structural
Screw per end, fasten Door Header to Center Posts. Ensure Rear Center Poly Panel is installed
before fastening Door Headers.
Pieces:
- 2x Door Header
(3 1/2” x 3 1/2” x 38 1/2”)
Hardware:
- 4x 7 1/4” Structural Screws
10. Locate Rear Center Poly Panel and slide in between rear Center Posts.
Pieces:
- 1x Rear Center Poly
(1/4” x 32” x 52 3/4”)

Related product manuals