5-3
5 Run
NB-series Programmable Terminals Startup Guide Manual(V109)
5-1 Preparations
5
3
Select [PLC] - [Transfer] - [To PLC] from the main menu.
4
Send data according to the procedures described on the screen.
5
Select [PLC]-[Operating Mode]-[Run] from the main menu.
CP1E starts running.
z Using a USB cable to connect NB7W and a PC
The screen programs created by NB-Designer can be sent to NB7W.
Note • It is allowed to use USB cables of any standards.
• Use a USB cable with a maximum length of 5 m.
Connect NB7W and PC