INSTALLATION
GENERAL
Installations
must
be
considered
individually,
however,
the
following
installation
guidelines
should
be
followed.
Installations
must
conform
to
local
building
codes,
fire
ordinances
and
other
local,
state
or
federal
regulations.
See
Figure
1.
installation
points
to
consider
include:
1
Level
mounting
surface.
2
Adequate
cooling
air.
3.
Adequate
fresh
induction
air.
4.
Discharge
of
circulated
air.
5
Discharge
of
exhaust
gases.
6
Eiectncai
connections.
7
-ut-!
connections.
8
Accessibility
for
operation
and
servicing.
9
Vibration
isolation.
10
N
o
i
s
e
levels.
Provide
a
location
that
is
protected
from
the
weather
and
IS
dry.
clean,
dust
free
and
well
ventilated.
If
practical,
install
inside
a
heated
building
for
protec-
tio*^
from
extremes
in
weather
conditions.
Permanent
installations
need
a
sturdy,
level
mounting
base
of
concrete,
heavy
wood,
structural
steel
or
other
sturdy
support
at
least
12
inches
(305
mm)
high
to
aid
routine
maintenance,
operation
and
service.
Assemble
the
vibration
isolators
in
the
order
as
shown
in
Figure
2.
The
spacer
bushing
prevents
compres¬
sion
of
the
snubber
or
upper
rubber
cushion.
Two
CARRIAGE
BOLT
SQUARE
NUT
LOCK
WASHER
FLAT
WASHER
SNUBBER
GENERATOR
OR
OIL
BASE
MOUNTING
FOOT
CUSHION
MOUNTING
SPACER
BUSHING
FLAT
WASHER
The
aif
discharge
side
of
set
requires
3
inches
(76
mm)
clearance
from
wall
to
permit
set
to
rock
on
Its
mounts;
at
least
24
inches
(610
mm)
clearance
is
required
around
all
other
sides
for
service
accessibili-
FIGURE
2.
VIBRATION
ISOLATOR
FIGURE
1.
TYPICAL
CCKB
GENERATING
SET
INSTALLATION