EasyManua.ls Logo

OPCOM GrowWall - Page 12

OPCOM GrowWall
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 8. Install The Control Box
1. Attach the control box by aligning the holes on the back with the screws on the
right side vertical pipe, and then pushing down to lock in place.
2. Ensure the pump and LED lamps' power cables were plugged into the slot on the
control box.
GrowWall
P9
User Manual
1
2
AC
Pump
LED