L4
L1
L2
L3
R4
R3
R1
R2
L4
L1
L2
L3
R4
R3
R1
R2
R1
R2
R2
R3
L2
L3
Step 3. Starting with R1, L1 on the bottom, insert the two vertical tubes of R2, L2
into the corresponding tubes on R1, L1.
Align the holes on the two parts, and secure each of the two junctions by
inserting a plastic rivet, using a rubber mallet.
NOTE: Many accessories and parts, such as the rivets, have been
placed inside the sprout box for shipping.
Step 4. Repeat the process with R3,L3 on top of R2,L2 the same way.
GrowWall
P6
User Manual
L1
L2
Step 3.
Step 4.