EasyManua.ls Logo

opti-solar 2KVA - Installation; Unpacking and Inspection; Preparation

Default Icon
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
INSTALLATION
Unpacking and Inspection
Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should
have received the following items inside of package:
The unit x 1
User’s manual x 1
Communication cable x 1
Preparation
Before connecting all wirings, please take off bottom cover by removing two screws as shown below.

Related product manuals