EasyManua.ls Logo

ORKEL MP 2000 - 5.1.10- Wide film - Net binding

Default Icon
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
66
-
The Hit - unit, containing wide lm or net is located on top
of the chamber. ( - gh ension)

1. Clean and lubricate the slides for feeder rollers.
2. Check chain tension and its condion. Adjust the tension by loosen the bolt and turn the nylon eccen-
tric to add more tension to the chain. Then reghten the bolt.
3. Check all movable parts and bearings in the HiT -unit.
4. Check the condion of hydraulic hoses and couplings. Exam the unit for any leakages
5. Control the free wheel’s funcon (feeder rollers).
Feeder, motor
Feeder rollers
Free wheel

Related product manuals