1
1. Running
1.1 Safety Points
During operation, the unit may have very hot or cold surfaces.
Thetemperatureprobeisinstalleddirectlyinthesecondaryow.Do
notremovewhenthesystemishot,fullofwaterorunderanypressure.
Takecarewhenlifting.Onlyusethedesignatedliftingpoint.Useonly
certiedliftingequipmentcapableofliftingtheweight.Residualwater
may also be present and spillage could occur.
NeverlifttheOrmandyRycroftBreezebyanyassociatedpipeworkor
pipe connections.
Takecarewhenhandling,assomeedgesmaybesharp.
Theequipmenthasdangerfromelectricity.Donotremovecoversor
allowanyexposedliveparts.Isolatebeforeworkingontheunit.
The electrical and mechanical functionality must be considered prior
toconnectinganynonfactoryttedequipment.E.g.pumps,valves,
actuators etc.
PowersupplyandcontrolsignalcablesMUST be segregated as far as is
reasonably practical.
Shielded control cables must be used.
Localauthorityregulationsmustbefollowedatalltimes.
Ensurealloperationsarecarriedoutbysuitablytrained/qualied
personnel.
Checks
Complete ()
Check that electrical installation is complete.
Check that the mechanical installation is complete.
Checkthatthesystemhasbeenushed,butNOT through the plate pack and
that there are no leaks.
Check that any air has been eliminated from the system.
Checkthatvalvesareopenedintherequiredsequence.
1.2 Start Up