EasyManua.ls Logo

Outsunny 84C-095 User Manual

Outsunny 84C-095
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Assembly video please scan the QR code .
84C-095
ASSEMBLY INSTRUCTION
READ AND SAVE THIS INSTRUCTION FOR FUTURE USE
INbed005V02_GL
Question and Answer IconNeed help?

Do you have a question about the Outsunny 84C-095 and is the answer not in the manual?

Outsunny 84C-095 Specifications

General IconGeneral
TypeGazebo
Frame MaterialSteel
Canopy MaterialPolyester
ShapeSquare
UV ProtectionYes
Water ResistanceYes
Assembly RequiredYes
Eaves Height6.5 ft.
Dimensions10 ft. x 10 ft.
MaterialSteel, Polyester

Summary

Gazebo Assembly Guide

Required Tools

Lists the necessary tools for assembling the product.

Safety Precautions

Contains crucial safety warnings and precautions for product assembly and use.

Step 01: Initial Frame Setup

First step of assembly, connecting uprights with base components.

Step 02: Horizontal Frame Assembly

Second step, connecting horizontal beams to form the upper frame.

Steps 03 & 04: Frame Reinforcement

Steps three and four focus on reinforcing the main gazebo frame structure.

Step 05: Beam Installation

Fifth step, installing beams onto the main uprights and tightening connections.

Step 06: Corner Brackets and Supports

Sixth step, attaching corner brackets and support elements to the frame.

Step 07: Roof Beam Installation

Seventh step, installing diagonal roof support beams.

Step 08: Connecting Roof Supports

Eighth step, connecting roof support members to the frame.

Step 09: Central Roof Connector

Ninth step, attaching the central piece for the roof structure.

Step 10: Main Roof Panels

Tenth step, installing the primary roof panel sections.

Step 11: Triangular Roof Panels

Eleventh step, attaching the triangular sections of the roof.

Step 12: Roof Panel Diagram

Schematic diagram showing the distribution of iron plates on roof panels.

Step 13: Panel to Frame Connection

Thirteenth step, connecting roof panels to the main gazebo frame.

Step 14: Leak Prevention Fastening

Fourteenth step, securing roof panels with specific fasteners to prevent water leaks.

Step 15: Final Roof Securing

Fifteenth step, completing the fastening of all roof panels.

Step 16: Corner Trim Installation

Sixteenth step, installing decorative and structural corner pieces on the roof.

Step 17: Mesh Curtain Attachment

Seventeenth step, attaching the mesh curtain panels to the frame.

Step 18: Ground Stake Installation

Eighteenth and final step, securing the structure with ground stakes.

Related product manuals