14
2. Clamp each Sub CTs around the circuit you wish to monitor. Make
sure the arrow on the CT must point towards the load or Inveer!
N
Loads
Inveer
P1
P2
Load
or
Breakers
Inveer
Note: If the circuit you are monitoring can generate energy such as
Inverter, etc., after all the wiring is completed, please manually set
the phase of the circuit in the app settings, otherwise the power
measurement will be incorrect.
3. Inse each 2.5mm audio plug of Sub CT into the audio jack on the
side of the Power Meter. Remember the number of the audio jack
connected to the circuit you are measuring, and you may need to
match it on your app.
21