EasyManua.ls Logo

Panasonic CS-A7CKP

Panasonic CS-A7CKP
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11 2-way, 3-way Valve
2-way Valve (Liquid Side) 3-way Valve (Gas Side)
Works Shaft Position Shaft Position Service Port
Shipping Close Close Close
(With valve cap) (With valve cap) (With cap)
Evacuation Close Close Open
(Installation and (Counter-Clockwise) (Clockwise) (Push-pin)
Re-installation)
Operation Open Open Close
(With valve cap) (With valve cap) (With cap)
Pumping down Close Open Open
(Transferring) (Clockwise) (Counter-Clockwise) (Connected manifold
gauge)
Evacuation Open Open Open
(Servicing) With vacuum pump
Gas charging Open Open Open
(Servicing) (With charging cylinder)
Pressure check Open
(Servicing) Open Open (Connected manifold
gauge)
Gas releasing Open
(Servicing) Open Open (Connected manifold
gauge)
54
CS-A7CKP CU-A7CKP5 / CS-A9CKP CU-A9CKP5 / CS-A12CKP CU-A12CKP5

Other manuals for Panasonic CS-A7CKP

Related product manuals