EasyManua.ls Logo

Panasonic CS-F43DTE5

Panasonic CS-F43DTE5
145 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
42
9.6.7. Pump-down Control
To enable pump down operation, at outdoor PCB, set the DS1and DS2 to OFF position.
Press Test Run button for 1 second.
During Pump Down operation, push the Test Run button again for 1 second to stop the pump down operation.
The pump down operation run for 10 minutes.

Table of Contents

Other manuals for Panasonic CS-F43DTE5

Related product manuals