11.2.3. Re-air purging (Re-installation)
 1. Confirm that both the 2-way and 3-way valves are set to
the closed position.
 2. Connect the charge set and a charging cylinder to the
service port of the 3-way valve.
 • Leave the valve on the charging cylinder closed.
 3. Air purging.
 • Open the valves on the charging cylinder and the
charge set. Purge the air by loosening the flare nut on
the 2-way valve approximately 45° for 3 seconds then
closing it for 1 minute; repeat 3 times.
 • After purging the air, use a torque wrench to tighten the
flare nut on the 2-way valve.
 4. Check for gas leakage.
 • Check the flare connections for gas leakage.
 5. Discharge the refrigerant.
 • Close the valve on the charging cylinder and discharge
the refrigerant until the gauge indicates 3 to 5 kg/cm
2
G
(0.3 to 0.5 MPa)
 6. Disconnect the charge set and the charging cylinder,
and set the 2-way and 3-way valves to the open
position.
 • Be sure to use a hexagonal wrench to operate the valve
stems.
 7. Mount the valve stem nuts and the service port cap.
 • Be sure to use a torque wrench to tighten the service
port cap to a torque 1.8 kg.m (18 N.m).
 • Be sure to check for gas leakage.
Procedure:
60
CS-A18DKD CU-A18DKD / CS-A24DKD CU-A24DKD