EasyManua.ls Logo

Panasonic CU-E21CKE - Page 43

Panasonic CU-E21CKE
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Outdoor heat exchanger pipe temperature
a 15°C
b 18°C
c 25°C
Notes
1. During deice operation, the relationship between outdoor pipe temperature and time T1 is such proceed to next
operation.
2. The deice will be performed only after 1 hour from when the operation has started.
3. When Comp. OFF by the sequence No. 1, 6, 7 compressor can restart back without 3 minutes waits (immediate restart).
43

Table of Contents

Related product manuals