EasyManua.ls Logo

Panasonic FV-08VQL3 - Installation I: Joist Mounting Assembly

Panasonic FV-08VQL3
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
Installation (Joist mounting installaton) continued
I
IMPORTANT:
Make sure that body "Claws" are properly inserted
into adapter slots.
In case body and blower are installed separately.
Remove 3 screws.
Remove blower section.
Insert fan body into ceiling.
Mount blower section
and fix with 3 screws.
IMPORTANT:
Make sure that frame is
properly inserted into
groove of blower section.
Secure fan body to adapter using two thumb screws.
8.
7.
(Fig.6-1)
(Fig.6-2)
(Fig. 5)
(Fig.6-3)
(Fig. 5)
Insert fan body into ceiling.
Fig. 6-1
Fig. 6-2
Fig. 6-3
Fig. 5
Fig. 7
(Fig. 7)
Ceiling
Body
Claws
Adapter slots
Thumb screws
Groove
Frame
section
Frame section
Blower section
Screws
Blower
Claws
Tape
Duct
Frame section
Ceiling

Other manuals for Panasonic FV-08VQL3

Related product manuals