EasyManua.ls Logo

Panasonic FV-11VHL1 - For New Type Lighting Unit Assy. (Electronic Ballast); For Old Type Lighting Unit Assy. (Magnetic Ballast)

Panasonic FV-11VHL1
8 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
II
(IN
EXISTING
CONSTRUCTION)
Installing
the
ventilating
fan
in
an
existing
building
requires
an
accessible
area
(attic
or
crawl
space)
above
the
planned
installation
location,
or
existing
ducting
and
wiring.
1.
To
install
the
ventilating
fan,
follow
the
procedures
describe
installation.
Installation
1.
Take
the
following
precautions
before
CAUTION
Check
area
above
planned
installation
location
to
be
sure
th:
1.
Duct
work
can
be
installed
and
that
area
is
sufficient
for
proper
ventilation.
2.
Wiring
can
be
run
to
planned
location.
3.
Nowiring
or
other
obstructions
wil
interfere
with
installation.
2.
_
Inspect
duct
work
and
wiring
before
proceeding
with
installation.
Plan
suitable
location
for
ventilating
fan.
(next
to
ceiling
joist)
4,
Before
installation,
provide
inspection
and
maintenance
access
а!
a
location
that
wil
not
interfere
with
installation
work
shown
in
Installation
|.
MAINTENANCE
+
Illustrations
in
this
manual
are
for
FV-11VHL1.
WARNING
Disconnect
power
source
before
working
on
unit.
Routine
maintenance
must
be
done
every
year.
CAUTION
1.
Never
use
petrol,
benzene,
thinner
or
any
other
such
chemicals
for
cleaning
the
ventilating
fan.
2.
Donotallow
water
to
enter
motor.
3.
Donotimmerse
resin
parts
in
water
over
60
°C
(140
°F).
1.
Remove
grille.
(Squeeze
mounting
spring
and
pulldown.)
2.
Wash
and
clean
grille.
(Use
non-abrasive
kitchen
de-
(Fig.
8)
tergent.)
Wipe
dry
with
new
cloth.
(Fig.
9)
Fig.
9

Other manuals for Panasonic FV-11VHL1

Related product manuals