Lever of Cassette Up Ass’y set incorrectly.
A. When installing the Front Panel Ass’y, swing the Cassette Door-
Lid all the way open until the Cassette Door tab clears the
Opener Lever.
B. Make sure that all locking tabs are aligned properly.
Then, press the Front Panel straight in.
Fig. D3
3. Removal of VCR Chassis Unit & Frame
When removing the VCR Chassis Unit & Frame, push the 2
Locking Tabs to release. Then, slide the VCR Chassis Unit &
Frame to front side.
Installation of VCR Chassis Unit
When installing 2 Screws (460), slide the Holder Unit of the
Cassette Up Ass'y (Refer to "WHEN LOADING WITHOUT A
CASSETTE" in Service Notes) to tighten screws. Then, slide it
back to the EJECT Position.
4. Installation of Mechanism Chassis and Cassette Up Ass’y onto
Main C.B.A.
A. Make sure the Mode Select SW. on the Main C.B.A. is in EJECT
position. If not, rotate the Mode Select SW. until the alignment
projection is in the EJECT Position.
Fig. D4
25