EasyManua.ls Logo

Panasonic S-12MT2U6 - Page 21

Panasonic S-12MT2U6
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
Reference diagram for air-discharge chamber (field supply) (continued)
Combination of units
For various types of combination, refer to Technical Data.
unit: in. (mm)
J
K
E
G
E
J
K
G
J
K
F
H
M
L
D
L
M
D
L
M
F
I I
101-3/16
(2570)
28-55/64
(733)
39-31/64
(1003)
3/64 (1) 5/64 (2)
Top view
(Before installing air-discharge chamber)
Top view
C : 28-47/64 (730) Installation hole pitch
B : 28-47/64 (730) Installation hole pitch downward tubing direction
A : 37-61/64 (964) Installation hole pitch forward tubing direction
Front view Right side view
According to the installation site, you may choose the setting position in the depth direction of the anchor bolt from “A”, “B” or “C”.
D E F G H I J K L M
A :
Installation hole pitch
2-23/64
(60)
2-1/8
(54)
144-21/64
(3,666)
3-35/64
(90)
142-29/32
(3,630)
3-15/64
(82)
45-9/32
(1,150)
46-11/16
(1,186)
45-19/32
(1,158)
43-13/16
(1,113)
B :
Installation hole pitch
7-3/32
(180)
6-27/32
(174)
153-25/32
(3,906)
8-17/64
(210)
152-23/64
(3,870)
7-61/64
(202)
45-9/32
(1,150)
46-11/16
(1,186)
45-19/32
(1,158)
43-13/16
(1,113)
C :
Installation hole pitch
7-3/32
(180)
6-27/32
(174)
153-25/32
(3,906)
8-17/64
(210)
152-23/64
(3,870)
7-61/64
(202)
45-9/32
(1,150)
46-11/16
(1,186)
45-19/32
(1,158)
43-13/16
(1,113)
01_302412_Eng.indd 21 2018/7/4 13:30:34

Other manuals for Panasonic S-12MT2U6

Related product manuals