1
1-341
 Installing Distribution Joint Kit (for Triple)
(CZ-P3HPC2)
 Check the system combination before installing the 
distribution joints.
 Three indoor units must be installed within the 
same room.
 Use the supplied tube connectors to adjust the tube 
sizes of the distribution joints.
How to Install Distribution Joints
Use the supplied distribution joints to complete 
refrigerant tubing work.
Install distribution joints so that the tubes are 
horizontal after the branch point.
Orientation of distribution joints
Length requirement for strainer on main 
distribution tube side
ttach a straight tube 500 mm or longer to the main 
tubing side of the distribution joint (for both liquid and 
gas tubing).
Tubing insulation
Be sure to apply thermal insulation to both the liquid 
and gas tubing.
Depending on the conditions inside the ceiling, 
condensation may form on the insulation material.  If 
high temperatures and high humidity are expected 
to occur inside the ceiling, add glass wool (16-20 kg/ 
m
3
, with a thickness of 10 mm or more) to the below 
insulation materials and apply sufficient thermal 
insulation.
Only the distribution joints are horizontal 
with respect to the ground.
The collective tubes are vertical with respect 
to the ground. 
The collective tube and distribution 
joint are horizontal with respect to the 
ground.
Collective tube
Distribution joint
<Gas tube side>
Only the distribution joints are horizontal with 
respect to the ground. The collective tubes are 
vertical with respect to the ground. 
The collective tube and distribution 
joint are horizontal with respect to the 
ground. 
Collective tube
Distribution joint
<Liquid tube side>
Be sure to install so that the 
tubes are horizontal after the 
branch point.
INCORRECT
More than 500 m
m
Distribution joint insulation material (supplied)
Use the supplied insulation material.
The supplied insulation material include only a 
tape for temporarily fastening.
Use insulation material or other material to seal 
the joining lines so that there are no gaps.
Use vinyl tape or similar means to seal and 
fasten the insulation materials in place.
Tubing insulation material 
(field supply; thickness of more than 10 mm)
Tubing insulation material must be able to with 
stand temperatures of at least 120°C.
Seal securely with vinyl tape (4 locations)
Refrigerant tubing (field supply)
Refrigerant tubing (field supply)
Inclination
Inclination
More than 500 mm
SM830231-02Single欧州.indb341SM830231-02Single欧州.indb341 2014/09/1913:21:532014/09/1913:21:53