1-671-66
Refrigerant tubing • drain hose position
Unit opening position (Refrigerant tubing • drain hose • power inlet port • remote control wiring inlet port)
Required Minimum Space for Installation and
Service
Dimensions of suspension bolt pitch and unit
Length
Type
ABC
26
inch 48-17/64 50-13/64 9-1/4
mm 1226 1275 235
36, 42
inch 62-43/64 62-19/32 9-1/4
mm 1541 1590 235
Air intake
Air discharge
(Suspension bolt pitch)
(Suspension
bolt pitch)
Unit: inch (mm)
Unit: inch (mm)
Unit: inch (mm)
Rear (Figure shows view from front)Left side
Left drain position
Closed with rubber stopper
at time of shipment.
Left drain position
Gas tubing
Liquid tubing
Right drain position
(Liquid tubing •
Gas tubing)
Right side
Right drain position
Left-side drain hose
outlet port
Top outlet port
Right-side drain
hose outlet port
Side cover
Outside air intake duct
connection port
(ø3-15/16 (100), cutout)
Rear outlet port (Figure shows view from front)
Remote control wiring
and inter-unit wiring inlet port
Left-rear side drain
hose outlet port
(cutout)
Cover of tubing hole
Power Supply inlet
*1 Use a compass saw, jig saw or similar tool and cut along
the indented portion of the side cover and make a hole
inside the cover.
*2 When pulling the refrigerant tubing from the upper side,
cut along the indented portion and pass the tubing
through the hole.
NOTE
Be sure to use sealing putty to seal off the opening to
prevent dust.
1-4. Dimensional Data
Indoor Unit : Cealing (Type T2)
1
SM830203-04.indb 67 15/10/16 10:44:41