EasyManua.ls Logo

Paragon P10 - Page 24

Paragon P10
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
P a g e | 23
P10 INSTALLATION INSTRUCTIONS
Offer the fire box assembly within the masonry aperture at the same time guiding the gather
hood within the guides situated on the top of the fire box (Please see picture below). Engage
the hood studs within the slotted holes and secure using the three M4 nuts provided within the
gather hood kit.

Related product manuals