EasyManua.ls Logo

Parker 250 - Page 7

Parker 250
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
250 5
English
6 Maintenance
•  e machine is designed and built to guarantee continuous opera-
tion; however, the life of its components depends on the maintenance
performed;
when requesting assistance or spare parts, identify the machine
(model and serial number) by reading the data plate located on the
unit.
6.1 General instructions
! Before any maintenance, make sure:
the pneumatic circuit is no longer pressurized;
the dryer is disconnected from the main power supply
! Risk of electric shock can cause injury or death.
Disconnect all remote electric power supplies before servicing.
.
Y Always use the Manufacturer’s original spare parts: otherwise the
Manufacturer is relieved of all liability regarding machine malfunction-
ing
Y In case of refrigerant leakage, contact quali ed and authorized per-
sonnel.
Y e Schrader valve must only be used in case of machine malfunc-
tion: otherwise any damage caused by incorrect refrigerant charging will
not be covered by the warranty.
6.2 Refrigerant.
Charging: any damage caused by incorrect refrigerant replacement car-
ried out by unauthorized personnel will not be covered by the warranty.
Z
Y
At normal temperature and pressure, the R407C refrigerant is a
colourless gas classi ed in SAFETY GROUP A1 - EN378 (group 2  uid
according to Directive PED 97/23/EC)
GWP (Global Warming Potential) = 1652,5.
! In case of refrigerant leakage, ventilate the room.
Preventive Maintenance Programme
To guarantee lasting maximum dryer e ciency and reliability
Maintenance
Activity Description
Maintenance Interval
(standard operating conditions)
Activity
Check
Service
Daily
Weekly
4 Months
12 Months
36 Months
Check POWER ON indicator
is lit.
Check control panel indicators.
Check condensate drain.
Clean condenser  ns.
Check electrical absorption.
Check refrigerant leaks
Depressurize the dryer.
Complete drain maintenance..
Depressurize the dryer. Replace
pre- and post- lter elements.
Check temperature sensor.
Replace if necessary.
Dryer maintenance kit.
e following are available (see par. 8.4):
a) 3 years preventive maintenance
b) service kit
• compressor kits;
• fan kits;
hot gas valve kits;
b) individual spare parts.
6.3 Dismantling
e refrigerant and the lubricating oil contained in the circuit must be
recovered in conformity with current local environmental regulations.
%
Recycling Disposal Z
structural work steel/epoxy-polyester resins
exchanger aluminium
pipes aluminium/copper/carbon steel
drain
exchanger insulation EPS (sintered polystyrene)
pipe insulation synthetic rubber
compressor steel/copper/aluminium/oil
condenser steel/copper/aluminium
refrigerant R407C
valves brass
electrical cables copper/PVC

Related product manuals