EasyManua.ls Logo

Parker CHELSEA 267 Series - RY Wet Spline Installation Sketch; AF Wet Spline Installation Sketch (267)

Parker CHELSEA 267 Series
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Bulletin HY25-1380-M1/US
Owner’s Manual
Parker Hannifin Corporation
Chelsea Products Division
Olive Branch, MS 38654 USA
28
Installation Instructions
10-Bolt Powershift P.T.O.s
CAUTION: Wet Spline Options Must be used with a Pump that has a Contiguous Sealing surface to
Ensure a proper seal between Pump and P.T.O.
Installation “RY” Wet 267 Series (SK-351 Rev C)
Installation “AF” Wet Spline 267 Series (SK-350 Rev C)
Install 22-P-84 gasket between
P.T.O. and Pump. Install
22-P-100 gasket between
bearing cap & output flange on
P.T.O.
379896
500841-1
329057-2X
Connect to transmission
pressure port. Hose must
be ordered separately.
See hose charts on
page 27 for Caterpillar and
page 29 for Allison.
Install 35-P-92 gasket
between P.T.O. and Pump
379896
500841-1
329057-2X
Connect to transmission
pressure port. Hose must
be ordered separately. See
hose charts on
page 27 for Caterpillar and
page 29 for Allison.
Parker
lchelsea

Table of Contents