EasyManua.ls Logo

Parker PGBV-2600 User Manual

Parker PGBV-2600
14 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
PARKER
PGBV-2600
OWNERS MANUAL
26cc petrol leafblower/vac mulcher
Question and Answer IconNeed help?

Do you have a question about the Parker PGBV-2600 and is the answer not in the manual?

Parker PGBV-2600 Specifications

General IconGeneral
BrandParker
ModelPGBV-2600
CategoryBlower
LanguageEnglish

Summary

Guarantee Information

General Safety Instructions

Component Identification

Pipe Identification

Diagrams showing the different intake and blow pipes for the machine.

Part Description

Diagrams labeling the main parts of the leafblower/vac mulcher.

Assembly Procedures

Assembling the Vacuum

Instructions for assembling the vacuum function of the leafblower.

Blower Assembly

Assembly and Fueling

Blow Pipe Installation

Steps for attaching the blow pipes to the machine securely.

Filling the Fuel Tank

Procedure for safely filling the fuel tank with petrol mixture.

Starting the Machine

Step 1: Turn the Engine Switch 'ON'

Instructions to turn the engine switch to the 'ON' position.

Step 2: Prime the Carburetor

Pressing the fuel primer bulb to prime the fuel system.

Step 3: For Cold Engine Starts

Adjusting the choke lever for cold engine starts.

Step 4: Pull the Starter

Pulling the starter cord to start the engine.

Step 5: Run the Engine

Allowing the engine to warm up at idle speed.

Flooded Engine Procedure

Step 1: Disconnect the Lead

Disconnecting the spark plug lead.

Step 2: Remove the Spark Plug

Removing and cleaning or replacing the spark plug.

Step 3: Install the Spark Plug

Installing and tightening the spark plug.

Step 4: Start the Engine

Repeating the starting procedure for a warm engine.

Step 5: Run the Engine

Running the engine to reach operating temperature.

Engine Adjustments and Stopping

Adjusting the Engine Idle Speed

Steps to adjust the engine idle speed using the screw.

Stopping the Engine

Procedure for safely stopping the engine after use.

Routine Maintenance Schedule

Daily Maintenance Checks

Daily checks and cleaning of the blower exterior and components.

Every 10 Hours Maintenance

Maintenance tasks to be performed every 10 hours of use.

Every 10/15 Hours Maintenance

Spark plug maintenance tasks for every 10/15 hours.

Every 50 Hours Maintenance

Tasks for every 50 hours, including inspection and spark plug replacement.

Storage (30 days or longer)

Procedures for long-term storage of the machine.

Troubleshooting Guide

Engine Does Not Start

Troubleshooting guide for engine starting issues.

Engine Performance Issues

Guide for addressing issues like loss of power or unstable engine operation.

Product Specifications