EasyManua.ls Logo

Patron PHG-40 - Maintenance Schedule

Patron PHG-40
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
MAINTENANCE
MAINTENANCE SCHEDULE
* Must be performed by an authorized service technician.
** The pump oil must be changed after the rst 50 hours of operation and then every 250 hours or 3
months, whichever comes rst.
*** High pressure nozzle should be replaced whenever pressure drops to less than 85%.
**** Scale build-up will vary with mineral content in the water and amount of usage. Descaling can range
from weekly to yearly maintenance.
***** The engine oil must be changed after the rst 8 hours of operation and then every 50 hours or 3
months, whichever comes rst.
PROCEDURE DAILY 3 MONTHS 6 MONTHS 9 MONTHS 12 MONTHS
Check engine oil level X
Change engine oil ***** X X X X
Check water pump oil level X
Change water pump oil ** X X X X
Oil leak inspection X
Fuel leak inspection X
Water leak inspection X
Hose inspection X
Water inlet screen inspection X
Check fuel lter X X X X
Replace fuel lter X
Inspect belts X X X X
Replace high pressure nozzle *** X X X X
Inspect fuel pump lter * X
Replace fuel nozzle * X
Check burner air adjustment X X X X
Check burner electrodes * X
Test water pressure * X X X X
Test fuel pressure * X X X X
Test water temperature * X X X X
Descale coil ****
X