EasyManua.ls Logo

Paul NOVUS 300 User Manual

Paul NOVUS 300
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Version: 2.0_10/2014 EN

Table of Contents

Other manuals for Paul NOVUS 300

Question and Answer IconNeed help?

Do you have a question about the Paul NOVUS 300 and is the answer not in the manual?

Paul NOVUS 300 Specifications

General IconGeneral
Maximum air flow300 m³/h
Voltage230 V
Frequency50 Hz
Phase1
Filter classG4
MountingWall-mounted
Weight25 kg

Summary

Introduction

Safety

Crucial safety instructions, warnings, and precautions for operating the NOVUS.

Hints for the Operator and Qualified Personnel

Product Description

An overview of the NOVUS ventilation unit's features and design.

Frost Protection

Explains the automatic system to prevent heat exchanger freezing.

LED Control Panel

Operating Functions of the LED Control Panel

Details the specific functions of each key on the LED panel.

Signalling of Operating and Error Conditions

Describes LED indicators for operating status and errors.

TFT Touch Panel

Operating Function and Signalling of the TFT Touch Panel

Details the operation and signalling of the TFT touch panel.

TFT Touch Panel Menu Structure

Main Menu: Information

Main Menu: Settings

Submenu Fan Speeds

Adjusts fan speeds and boost ventilation timing.

Submenu Filter

Configures filter duration and reset options.

Submenu Frost Protection

Sets various frost protection modes.

Submenu Automatic Timing

Sets up custom timed ventilation schedules.

Operator Maintenance

Filter Replacement

Step-by-step instructions for replacing the unit's filters.

Resetting Filter Run-time

Procedure to reset the filter timer after replacement.

Failure Troubleshooting

Qualified Personnel Guidance

Unit Mounting

Wall Mounting Procedure

Detailed steps for attaching the unit to a wall.

Mounting on Frame

Instructions for installing the unit on an optional mounting frame.

Air Duct Connection

Condensate Drain Connection

Instructions for connecting the condensate outlet.

Electrical Connections

Commissioning the NOVUS

Operational Readiness Checks

Essential checks before initial startup.

Air Volume Flow Adjustment

Setting the nominal airflow rate for the unit.

Nominal Airflow via LED Panel

Adjusting airflow using the LED control panel.

Valve Adjustment

Qualified Personnel Settings

Qualified Personnel Maintenance

Heat Exchanger Inspection & Cleaning

Procedures for maintaining the heat exchanger.

Error Visualization and Treatment

LED Control Panel Error Signalling

Interpreting error codes displayed by LEDs.

TFT Touch Panel Error Visualization

Displaying error messages in plain text on the TFT panel.

Plant 1 Circuit Diagram (NOVUS)

Plant 2 Circuit Diagram (NOVUS with Defroster)

Customer Maintenance Checklist (A)

Skilled Personnel Maintenance Checklist (B)

Air Flow Report Form

Commissioning and Handover Certificate

Related product manuals