EasyManua.ls Logo

Phase 3 Squall EDF - Page 16

Phase 3 Squall EDF
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 16
Page 16
Step 61
Apply more epoxy to the inside of the
moulded nosecone.
Step 62
Slide the nosecone in position. Wipe off any
excess epoxy that squeezes out.
Step 63
Locate the servo cover mouldings. Trim
them with a sharp knife using the moulded
lines as a guide.
Step 64
Apply a tiny smear around the perimeter
of the first elevon servo cover. Do not apply
too much adhesive.
Step 65
Glue the cover in position and hold or
apply a small strip of masking tape while
the epoxy cures.