EasyManua.ls Logo

Phase 3 Squall EDF - Page 7

Phase 3 Squall EDF
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 7
Page
7
Step 16
Use a couple of strips of masking tape
to retain the elevon servo leads in their
respective slots.
Step 17
Prior to fitting the control horns, trim away
the clear hinging tape from the slots in the
elevon.
Step 18
Locate a control horn and insert from the
top side of elevon. Note that the horn is
orientated forwards.
Step 19
Push the horn down into place ensuring
that it is flush with the top surface of the
elevon.
Step 20
Slide an elevon horn retaining plate over
the horn, noting its orientation.