Fig. 1-3-2 shows the tie-down areas. Create the six tie-down points in the tie-down area:
− On a hard surface, use six mounting blocks
− On a fine type soil, use six spike pickets
− On a clay type soil or rock surface, use six screw pickets.
Moor the aircraft as follows:
− Remove and keep the three plugs
− Install the three jack-point adaptors and jack-point lugs
− Attach rope between each jack-point lug and the tie-down points.
Section 1 - Ground Handling
Ground Servicing Guide Report No: 02484
Issue date: Apr 29, 2020
Page 1-3-2
PC24-A-A15-10-0001-00A-170A-A