PSEN cs3.1a/b
Operating Manual PSEN cs3.1a/b
1003295-EN-08
| 27
7. Press on the actuator for at least3seconds with approx. 50N.
After this time, an adhesive force of approx. 50% is achieved. The full adhesive force is
achieved after 72 hours at an ambient temperature of at least 20°C.
8. Check the adhesive force of the glue after 10 minutes.
The actuator must no move when pressed sideways.
9. Tighten the M3 plastic screw to 0,8 Nm.