EasyManua.ls Logo

Planet WGS-4215-8P2S - Installing the Switch; Wall Mount;Magnet Installation

Planet WGS-4215-8P2S
359 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Users Manual of WGS Managed Series
44
2.2 Installing the Switch
This section describes how to install your Managed Switch and make connections to the Managed Switch. Please read the
following topics and perform the procedures in the order being presented. To install your Managed Switch on a desktop or shelf,
simply complete the following steps.
2.2.1 Wall Mount/Magnet Installation
A. To install the Managed Switch on desktop or shelf, please follow these steps:
Step 1: There are 4 holes with 8mm diameter on the wall;
WGS-804HPT/WGS-4215-8T: the distance between the 2 holes is 133mm
WGS-4215 Series: the distance between the 2 holes is 163mm
Note: The line through them must be horizontal.
Step 2: Install a conductor pipe inside the board hole and flush the edge of the conductor pipe with the wall surface.
Step 3: Screw the bolts into the conductor pipe. The Wall-mount Managed Switch is between bolts and conductor pipe, as
shown below.

Table of Contents

Other manuals for Planet WGS-4215-8P2S

Related product manuals