EasyManua.ls Logo

Polaris Mazda BT-50 RW-50/15 - Step 7 - Fascia Installation

Polaris Mazda BT-50 RW-50/15
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 7 - Fascia installation
2. Plug the OEM button panel
harness into the back of the
OEM button panel
1. Connect PLUG A & B and the
GPS Antenna into the back of
the RW50/15 scr
een
3. Make sure all the cables are
tucked away neatly before se-
curing into place.
4. Rest the unit in place, test
all features first and then
gently push fascia panel back
into position
5. Plug the OEM Air condition-
ing control harnesses into the
back of the air conditioning
control panel
6. Gently push air
conditioning
controls back in.
7. Reposition Glove Box
11
BT50-Installation-Guide-V3 (2020) 10/03/20 3:14 pm Page 11

Related product manuals