No Diving or Jumping. Observe all Safety Rules.
2-4
j. Use a carpenter’s level as you install
each curved bottom rail to make sure
it is level.
k. Remove all the wooden stakes from
the ground.
2. Spread out Brick Sand/Stabilizer
a. Make sure any screw or bolt heads
that are to be covered with sand or
styrofoam are covered with duct tape
rst.
b. Make sure all of the trenches are
completelylledwithcrushedlime-
stone (or equivalent).
c. Spreadalayerofnebricksand(no
pebbles)/stabilizer over the founda-
tion area, 2" (5 cm) deep.
Use a rake to make the brick sand/sta-
bilizeratandsmooth.
3. Proceed to Section 3
14
Remember:
Spread brick sand/sta-
bilizer over the entire
pool foundation area
inside the base rails.
This provides a protec-
tive surface for the pool
liner to rest on.
13