31
10.0 COMPLETION
10.1 Completion
1. Instruct the user in the operation of the boiler and
system including the integral timer, explaining the
operational sequence.
2. Set the central heating and hot water temperature
control knobs to the requirements of the user.
3. Carefully read and complete all sections of the
Benchmark Commissioning Checklist at the rear of
this publication that are relevant to the appliance
and installation. These details will be required in the
event of any warranty work. The publication must be
handed to the user for safe keeping and each
subsequent regular service visit recorded.
4. For IE, it is necessary to complete a “Declaration
of Conformity” to indicate compliance with I.S. 813.
An example of this is given in I.S. 813 “Domestic
Gas Installations”. This is in addition to the
Benchmark Commissioning Checklist.
5. Hand over the Users Operating, Installation and
Servicing Instructions giving advice on the necessity
of regular servicing.
Fig. 39
Facia Panel
Case Front Panel
Publication No. 5116282