Do you have a question about the Potterton Gold HE A Range and is the answer not in the manual?
Mounting | Wall-mounted |
---|---|
Energy Efficiency Class | A |
Type | Combi |
Fuel Type | Natural Gas |
Warranty | 2 years |
Central Heating Flow Rate | Dependent on model and system requirements |
Provides a general description of the Potterton Gold Combi HE A boiler and its capabilities.
Lists the items included with the boiler unit upon purchase.
Diagram and key identifying the main components and their locations within the boiler.
Explains the operational sequence for the central heating function of the boiler.
Details how the boiler operates to provide domestic hot water, including priority.
Describes the boiler's built-in frost protection feature and its activation.
Explains the mechanism for protecting the pump from seizing.
Provides detailed technical specifications and performance data for the boiler models.
General information regarding water byelaws and relevant regulations.
Details regarding the central heating system requirements and water treatment.
Explanation of the boiler's automatic integral bypass function.
Information on the boiler's integrated timer and external control options.
Instructions for filling and pressurising the central heating system.
Details regarding the expansion vessel's capacity and requirements.
Information on the safety pressure relief valve and its discharge pipe.
Requirements for the domestic hot water system connections and regulations.
Guidance on shower controls and compatibility with the boiler.
Recommendations for water treatment in areas with hard water.
Guidance on selecting a suitable location for boiler installation.
Required clearances around the boiler for installation and maintenance.
Requirements for ventilation when installing the boiler in a compartment.
Specifications and standards for the gas supply connection.
Requirements for the electrical connection and supply.
Installation considerations for boilers in bathrooms or shower rooms.
Installation requirements for the condensate discharge pipe.
General guidelines and requirements for flue terminal positions.
Details and specifications for horizontal flue system installations.
Information on permissible lengths and configurations for twin and vertical flues.
List of available accessories for various flue systems.
Details on fitting the twin flue duct adaptor to the boiler.
Instructions for connecting the twin flue system correctly.
Specific fitting instructions for roof terminals.
Information on flue lengths for telescopic kits and maximum permissible lengths.
Guidance on fitting the rubber flue trim.
Information on the use and ordering of terminal guards.
Instructions for fitting and positioning the flue deflector.
Content and recommended use of the plume displacement kit.
Method for calculating and determining permissible flue lengths.
General instructions and considerations for fitting the plume displacement system.
Steps for unpacking the boiler and initial preparation before installation.
Procedure for flushing the central heating system.
Instructions for connecting and fitting the filling loop kit.
Steps for lifting and mounting the boiler onto the wall plate.
Instructions for installing the discharge pipe for the safety relief valve.
Guidance on connecting the condensate drain pipe.
Instructions for installing the horizontal flue system.
Detailed steps for making electrical connections to the boiler.
Essential electrical checks to perform before commissioning.
Step-by-step procedure for commissioning the boiler after installation.
Procedure for checking and setting the gas inlet pressure.
Instructions for setting the integral electro-mechanical timer.
Final steps including user instruction and handover.
Recommendations and requirements for annual servicing.
Detailed inspection procedure for annual servicing.
Procedure for removing and replacing the igniter.
Instructions for changing spark and sensing electrodes.
Steps for removing and replacing the fan assembly.
Procedure for removing and replacing the venturi.
Instructions for removing and replacing the injector.
Procedure for removing and replacing the burner.
Instructions for replacing the boiler's internal insulation.
Procedure for replacing the flue/heat exchanger thermostat sensor.
Instructions for replacing the water pressure sensor.
Procedure for replacing the central heating temperature sensor.
Instructions for replacing the safety thermostat.
Procedure for replacing the DHW temperature sensor.
Instructions for replacing only the pump head.
Procedure for replacing the entire pump unit.
Instructions for replacing the automatic air vent.
Procedure for replacing the pressure gauge.
Instructions for replacing the Hall Effect sensor.
Procedure for replacing the pressure relief valve.
Instructions for removing and replacing the plate heat exchanger.
Procedure for replacing the diverter valve motor unit or assembly.
Instructions for removing and replacing the printed circuit board (PCB).
Procedure for replacing the selector switch.
Instructions for replacing the gas valve and initial setting.
Procedure for removing and replacing the expansion vessel.
Detailed procedure for checking and adjusting the gas valve via CO2 levels.
Diagram showing the boiler's electrical connections and components.
Basic checks to perform before diagnosing faults.
Explanation of error codes displayed by the boiler.