EasyManua.ls Logo

Powersmart PSSHD24 - Page 13

Powersmart PSSHD24
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
Step 2: Installing the Upper Handle
1.
When installing the Upper Handle, please note that the Drive & Auger Cables will already be
pre-attached to Upper Handle.
2.
Attach Upper Handle using the Frame Handle Assembly Hardware (4 sets /Knob, Saddle
Washer, M8 Nut, T-Screw) for your Upper & Lower Handle connection.
3.
When attaching Assembly Hardware, make sure ALL cables are underneath the Frame (Upper &
Lower) Handles after installation as indicated in Figure 3. VERY IMPORTANT!!!***
***Assembling Drive & Auger Cables over the top of the Frame
Handle will cause unnecessary tension in the cables, resulting in the Snow
blower propelling forward whenstarting the engine and may causedamagetothe
drive&augercontrol
(levers) when trying to engage them.
4.
Cut and remove all tie wraps that are on Cables, Frame Handles, Drive Control (Lever) &
Auger Control (Lever).
5.
Verify that the connection for the Upper & Lower Drive/Auger Cables is accurate. (See
Figure 3)
Figure
3

Related product manuals