1
Powerware
®
5125 (9910 P33) Quick Start for IBM
®
Applications : 164950139 B
POWERWARE 5125 (9910 P33) QUICK START
FOR
IBM APPLICATIONS
NOTE The following procedure is for an IBM
9
pSeries
Z
rack only. If you have another type of rack, contact your service
representative (see page 4).
Step 1. UPS Setup
Qty. Powerware Part Number Description
2 — Mounting Handles
4 — Mounting Handle Screws
1 157604171-001 Left Fixed Mounting Rail Assembly
1 157604171-002 Right Fixed Mounting Rail Assembly
4 — 10-32 Clip Nuts
8 — 10-321/22 Pan-Head Screws
2 157604172-001 Rear Hold-Down Brackets
4 — 10-321/22 Flat-Head Screws
1 164201357
Powerware 4-Post Rail Kit User’s Guide
1 164201356
Powerware 5125 Installation Guide for IBM Applications
1. Attach the supplied mounting handles to the
mounting brackets.
NOTE The UPS and optional Extended Battery Modules
(EBMs) MUST be installed at the bottom of the rack. If placed
in a rack with existing equipment, the rack must be
reconfigured to allow the UPS installation at the bottom of
the rack.
NOTE The EBMs must be installed below the UPS.
2. Install the clip nuts over the holes on the back of the
rack.
NOTE The clip nuts for the first set of rails go over the holes
in position 2 and 4. If you are installing additional rails, the
next set of clip nuts should be placed 4 and 6 holes above the
last installed clip nut.
Position 2
Position 4
Position 8
Position 10Position 10
Second Set of Clip Nuts
First Set of Clip Nuts