8
4
(1) General Info
1) Operator must have roasting experience and trained by specialized roasting institute.
2) Before operating machine
Check if the machine is plugged in the wall socket and the power switch
is ON.
- Do not let touch power cord or surface of the machine when it is hot.
- Check the ventilation.
- For trouble-free roasting, always make sure the chaff drawer, pipe and cyclone are
emptied and clean.
2) POWER
-Power connection: plug power cord only into wall sockets with correct voltage
-Power requirements are listed on the machine’s label
-AC 230V (1PH) 60Hz 3.5A 820kw
2)-1 Supply condition
Gas pressure: Low pressure for home use. Follow proper specifications for gas supply.
Gas pressure varies with region/location. Please contact your local gas supply company.
2)-2 How to connect
- Electricity: Manufactured for general wall sockets
- Gas: inquired gas supply hook-up by your gas supply company. Always follow proper
gas supply procedures.