Generator is stopped by releasing fuel
solenoid.
Generator contactor is released and mains
contactor is closed. Hooter shall be
activated
7 Generator
Supervision Time
The time for which the Generator voltage
should, continuously be unhealthy to
generate a fault condition.
10Sec 0-999
Sec.
8 Generator O/S If the generator frequency goes beyond this
limit, genset shuts down immediately
65 Hz 40-80
Hz;
Disable
9 No. of Crank
Attempt
The maximum number of Cranks that shall
be issued to start the Generator
3 1-10
10 Crank Time Maximum Crank time 10Sec 0-25Sec
11 Crank Delay The delay between two successive Cranks 5 1-100Sec
12 Gen. pickup
Voltage
This is the ignition voltage of the genset 100V 80-150V
13 Generator warm up
time
After switching on the genset the load is
put on the genset on elapse of generator
warm up time
10 Sec 0-999
Sec.
14 Mains Restoration
Time
The time for which mains should be
continuously healthy before stopping the
Generator.
30Sec 0-999Sec
15 Generator
Recooling Time
The time for which Generator is allowed to
run on no load before switching off
30 sec 0-999Sec
16 Stop solenoid time The time for which stop solenoid will be
kept active while stopping the engine
30Sec 0-100Sec
17 Low Fuel time
delay
Time delay before this fault can be
activated.
Faults are described in details.
5 Sec 0-999Sec
18 LLOP Time delay Time delay before this fault can be
activated.
Faults are described in details.
5 Sec 0-999Sec
19 HWT Time delay Time delay before this fault can be
activated.
Faults are described in details.
5 Sec 0-999Sec
20 GCB to MCB time
delay
Changeover time delay from generator to
mains
2Sec 1 –5 Sec
21 Hooter Reset Time Time for which the hooter is switched on
after fault
30 Sec 0-999
Sec.
22 Over Current If the Current increase beyond this setting
the genset shuts down after the O/C delay
(Available only in DGC-6 with single
phase mains monitoring)
25 1 –70
Amp
23 O/C Delay Time for which the current has to be above
overcurrent setting before initiating shut
down process
(Available only in DGC-6 with single
10 0-999
Sec.