EasyManua.ls Logo

Protek B-810 - Installation; Installation Introduction; Preparation for Use

Default Icon
23 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
rp‘
SECTION
II
INSTALLATION
1
.
INTRODUCTION
This
section
provides
installation
instructions
with
this
Sweep
Function
Generator.
Th;
section
also
includes
information
on
preparation
for
using
the
Sweep
Function
Generator
an
storage.
Z.
PREPARATION
FOR USE
1
)
Power
Requirements.
This
Sweep
Function’Generator
requires
a
power
source
of
100,
120,
220
Volts
ac
:l:
10%
or
240
Volts
ac
zi:
5%
10%,
48
to
66H:
single
phase.
WARNING
IF
THIS
INSTRUMENT
IS
TO
BE
ENERGIZED
VIA
AN
EXTERNAL
AUTO
TRANSFORMER
FOR
VOLTAGE
REDUCTION,
BE
SURE
THAT
THE
COMMON
TERMINAL
IS
CONNECTED
TO
THE
NEUTRAL
POLE
OF
THE
POWER
SUPPLY.
2)
Line
Voltage
and
Fuse
Selection
CAUTION
BEFORE
TURNING
THE
SWEEP
FUNCTION
GENERATOR
LINE
SWITCH
TO
ON.
VERIFY
THAT
THE
INSTRUMENT
IS
SET
TO
THE
VOLTAGE
OF
THE
POWER
SUPPLIED.
Figure
2-1
provides
instructions
for
line
voltage
and
fuse
selection.
The
line
voltage
selection
and
the
proper
fuse
are
factory
installed
for
the
voltage
appropriate
to
instrument
destination.
CAUTION
USE
PROPER
FUSE
FOR
LINE
VOLTAGE
SELECTED.
“W.
..
M.“
"a.

Related product manuals