EasyManua.ls Logo

Pulsar V657 - Measuring Hourly Rate of Operation

Pulsar V657
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English
8
To measure the hourly rate of operation
1 Use the stopwatch to measure the
time required to complete 1 job.
2 Locate the second marker on the
main dial that corresponds to the
measured seconds, and the
tachymeter scale it indicates gives
the average number of jobs
accomplished per hour.
Ex. 1
“180” (tachymeter scale figure) x
1 job = 180 jobs/hour
CHRONOGRAPH
second hand:
20 seconds
Tachymeter
scale: “180”
Ex. 2: If 15 jobs are completed in 20 seconds:
“180” (tachymeter scale figure) x 15 jobs = 2700 jobs/hour
tachymeter scale:
“90” (tachymeter scale figure) x 2 (km or mile) = 180 km/h or mph
“90” (tachymeter scale figure) x 0.5 (km or mile) = 45 km/h or mph

Related product manuals