Optimizer4D Technical Speciļ¬cations
6 / 27
I/O-Port allocation
Port # PLC feature Comment
Input 1 - Power Switch ON1 Works as Power-on-switch when combined with ON2
Input 1 1.1 Start Measuring at position 1
Input 1 1.2 Start Measuring at position 2
Input 1 1.3 Start Measuring at position 3
Input 1 1.4 Start Measuring at position 4
Input 1 1.5 Start Measuring at position 5 /
Measuring Ins. Strobe
Input 1 1.6 Next work piece
Input 1 1.7 Crack acknowledge
Input 1 1.8 Plug test
Input 1 GND
Input 2 Power Switch ON2 Works as Power-on-switch when combined with ON1
Input 2 2.1 Select work piece Strobe
Input 2 2.2 Select work piece 0
Input 2 2.3 Select work piece 1
Input 2 2.4 Select work piece 2
Input 2 2.5 Select work piece 3
Input 2 2.6 Select work piece 4
Input 2 2.7
Input 2 2.8
Input 2 GND
Output 3 24 V 24 V Input / V
CC
Output 3 3.1 Ready for measuring
Output 3 3.2 Busy
Output 3 3.3 Measuring running
Output 3 3.4 Crack
Output 3 3.5 Break
Output 3 3.6
Output 3 3.7
Output 3 3.8
Output 3 GND
In/Output 4 24 V
In/Output 4 4.1
In/Output 4 4.2
In/Output 4 4.3
In/Output 4 4.4
In/Output 4 4.5
In/Output 4 4.6
In/Output 4 4.7
In/Output 4 4.8
In/Output 4 GND