EasyManua.ls Logo

QJE QJ3003P - Cleaning and Maintenance; Fuse Replacement Procedure; Technical Specifications; Detailed Specifications Table

QJE QJ3003P
9 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
QJ3003P QJ3005P
5. Cleaning and Maintenance
1. Disconnect the device from the mains prior to maintenance activities.
2. The power supply cables must not show any damage. Have a qualified technician maintain
the device.
3. Wipe the device regularly with a moist, lint-free cloth. Do not use alcohol or solvents.
4. There are no user-serviceable parts, apart from the fuse. Contact your dealer for spare parts if
necessary.
5. Store the device in a dry, well-ventilated, dust-free room.
Replacing the Fuse
1 Only replace the fuse by a fuse of the same type and rating.
2 Before replacing the fuse, unplug the mains lead.
3 Wedge the fuse holder out of its housing with a flat-head screwdriver.
4 Remove the damaged fuse from its holder and replace with the exact same type of fuse.
5 Insert the fuse holder back in its place and reconnect power.
1.Technical Specifications
input voltage
230 V~/ 50 Hz
fuse
1.6A/2A /250 V
output voltage
0-30 V
output current
0-3A/0-5 A
source effect
C.V. 0.01 % + 3 mV
C.C. 0.1 % + 3 mA
load effect
C.V. 0.01 % + 2 mV
C.C. 0.1 % + 10 mA
setup resolution
10 mV
1 mA
setup accuracy (25°C ± 5°C)
0.5 % + 20 mV
0.5 % + 10 mA
ripple (20Hz-20MHz)
2 mV rms
3 mA rms
temperature coefficient
100 ppm + 10 mV
100 ppm + 5 mA
read back accuracy
10 mV
1 mA
read back temp. coefficient
100 ppm + 10 mV
100 ppm + 5 mA
reaction time (10% rated load)
voltage rise: 100 ms
voltage drop: 100 ms
dimensions
115 (W) x 190 (H) x 240 (D) mm
weight
QJ3003P: 4Kg QJ3005P:5.3Kg
autonomy
8 hours of continuous use at maximum load
9

Related product manuals