EasyManua.ls Logo

QuadTech Sentry 20 Plus - User Manual

Default Icon
85 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Sentry Plus Series
Hipot Testers
Instruction Manual
Form 150697/A4
QuadTech, Inc., 2003
5 Clock Tower Place, 210 East
Maynard, Massachusetts, U.S.A. 01754
January 2005
Telephone: 978-461-2100
Sales: 800-253-1230
Facsimile: 978-461-4295
Website: www.quadtech.com
The material in this manual is for informational purposes only and is subject to change, without notice.
QuadTech assumes no responsibility for any error or for consequential damages that may result from the
misinterpretation of any procedures in this publication.
WARNING
Potentially dangerous voltages may be present on front and rear panel terminals. Follow all warnings in
this manual when operating or servicing this instrument. Dangerous levels of energy may be stored in
capacitive devices tested by this unit. Always make sure the high voltage indicator is not on when
connecting or disconnecting the device under test.
!
Product will be marked with this symbol (ISO#3864) when it is necessary for the user to refer to
the instruction manual in order to prevent injury or equipment damage.
Product marked with this symbol (IEC417) indicates presence of direct current.
Product will be marked with this symbol (ISO#3864) when voltages in excess of 1000V are
present.

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the QuadTech Sentry 20 Plus and is the answer not in the manual?

QuadTech Sentry 20 Plus Specifications

General IconGeneral
BrandQuadTech
ModelSentry 20 Plus
CategoryTest Equipment
LanguageEnglish

Summary

Warranty

Specifications

Dielectric and Insulation Specifications

Details AC/DC voltage, current, and insulation resistance specs.

Safety Precautions

Condensed Operating Instructions

Test Programming and Offset

Details programming specific tests (GC, AC, DC, IR, PA) and the offset procedure.

Connections and Measurement

Guides on connecting the DUT and initiating the measurement process.

Controls and Indicators

Installation

Operation

Test Programming

Details programming specific tests (GC, AC, DC, IR, PA) and setting up test sequences.

Offset, Measurement, and Error Handling

Details instrument offset, DUT connection, measurement, and error message interpretation.

Service & Calibration

Calibration Procedures

Details equipment, parameters, and step-by-step instructions for instrument calibration.

Related product manuals