EasyManua.ls Logo

Quooker ST-VAQ - Connecting Water

Quooker ST-VAQ
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connecting water
N.B. The Quooker operates under water supply pressure and must always be
fitted with the inlet combination (supplied).
The Quooker boiling-water tap must be connected according to the locally
applicable regulations.
Position the inlet combination at such a height that the difference in height
between it and the drain is the maximum possible to allow the expansion
water to run off (see D4).
1 Cutting through
cold water pipe
Cut through the cold water pipe at a
suitable point.
2 Making space
for T-piece
3 Connecting
T-piece
Position the T-piece between the pipe
sections and tighten the clamping nuts.
4 Fitting the inlet
combination
Connect the inlet combination to the
T-piece with a copper tube (15 mm).
Screw the transparent funnel in the
hole in the inlet combination provided
for this purpose.
1
2
3 4
C

Related product manuals