EasyManua.ls Logo

Rancilio epoca - 7.3. Starting up; 8. Use; 8.1. Preparing coffee

Rancilio epoca
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
54
7. OPERATION
7.1. Controls (Fig.6)
1 Main switch.
Two-position switch with led.
Turn on the switch, led on, the machine is turned
(apart from the boiler) and the pump is turned on
WR¿OOWKHERLOHU
2 Boiler resistance switch.
Two-position switch with led.
On activating the switch, the led comes on, and
power is supplied to the resistance for the boiler
water.
3 Coffee dispenser switch (mod. S1 - S1 TANK)
On pressing the button, continuous coffee dispen-
sing begins and the led comes on.
2QUHSUHVVLQJWKHVZLWFKWKHFRIIHHGHOLYHU\VWRSV
and the led goes out.
4 Electronic coffee delivery button panel.(mod.
E1). Five buttons with relative led:
A Press the button for a second, led on, release
EXWWRQDVPDOOFRIIHHLVGLVSHQVHG
The led turns off and dispensing ceases.
B Press the button for a second, led on, release
WKHEXWWRQWZRVPDOOFRIIHHVDUGLVSHQVHGIURP
the same unit.
The led turns off and dispensing ceases.
C Press the button for a second, led on, release
WKHEXWWRQDELJFXSRIFRIIHHLVGLVSHQVHG
The led turns off and dispensing ceases.
D Press the button for a second, led on, release
WKHEXWWRQWZRELJFXSVRIFRIIHHDUHGLVSHQVHG
from the same unit.
The led turns off and dispensing ceases.
E Press the button for a second, led on, release
WKHEXWWRQFRIIHHLVFRQWLQXRXVO\GLVSHQVHG
Press the button for a second, led off, release
EXWWRQFRQWLQXRXVGLVSHQVLQJRIFRIIHHFHDVHV
7RLQWHUUXSWGLVSHQVLQJWDNLQJSODFHE\SUHVVLQJ
A-B-C-D, hold button E down until the relative
led turns off.
5 Hot water supply tap
Tap: turn in an anticlockwise direction to open and
clockwise to close.
6 Steam supply handwheel.
Tap: turn in an anticlockwise direction to open and
clockwise to close.
7.2. Control instruments (Fig.6)
7 GaugeZLWKPRELOHQHHGOHRQD¿[HGGLDOZLWKD
scale and colour indicator areas.
Visual control of the boiler pressure.
8 Boiler water level indicator
9 Tank water level indicator (Mod.S1 TANK)
6.2. Connections
L Place the machine on the horizontal sur-
IDFHSUHYLRXVO\SUHSDUHG
%HIRUHFRQQHFWLQJWKRURXJKO\ZDVKWKHPDLQVZDWHU
pipes:
L/HDYHWKHZDWHUVXSSO\WDSVUXQQLQJDWIXOOSUHV-
sure for several minutes.
L&RQQHFWWRWKHPDLQVZDWHUVXSSO\
L Connect the machine to the socket.
7KRURXJKO\ZDVKDOOWKHZDWHUSLSHVRIWKHPDFKLQH
L/HDYHWKHZDWHUVXSSO\WDSVUXQQLQJDWIXOOSUHV-
sure.
L6ZLWFKRQPDLQVZLWFKZDLWXQWLOWKHERLOHU¿OOV
up to the level set.
L Switch on main switch 2 to begin heating the water
in the boiler.
L Operate each unit in order to allow the water to
HVFDSHIRUDERXWRQHPLQXWHUHSHDWWKHRSHUDWLRQ
twice.
L Deliver steam from the steam jets for about one
minute.
L'HOLYHUKRWZDWHUIRUDERXWRQHPLQXWHUHSHDWWKH
operation twice.
L Switch off switches 1 and 2.
L(PSW\WKHZDWHUIURPWKHERLOHUVHHSRLQW
IMPORTANT
Should the machine not deliver water for over
24 hours, wash the internal components be-
fore beginning work, repeating the operations
as described above
ATTENTION
Please be informed that in order to avoid
SUHVVXUHIDOOVGXULQJWKHERLOHU¿OOLQJZH¿WWHG
LQWRWKH¿OOLQJVROHQRLGYDOYHDUHVWULSWLRQ
1.25 mm.
If, during the installation, the machino get in
security mode (the on/off selection on the
WRXFKSDGZLOOÀDVKUHVHWWKHPDFKLQHXVLQJ
the main switch.
,QERWKFDVHVLWLVQHFHVVDU\WRSURYLGHDQDXWRPDWLF
differential switch (Fig. 6) at the start of the power
cable, complete with magnetic release elements in
DFFRUGDQFHZLWKWKHLGHQWL¿FDWLRQSODWHGHWDLOV)LJ
1). The contacts must have an opening of equal or
over 3 mm and with dispersed current protection of
30 mA.
5HPHPEHUWKDWHDFKPDFKLQHPXVWEH¿WWHGZLWKLWV
RZQVDIHW\HOHPHQWV
WARNING:
Should the power supply cable be damaged
it is to be replaced by the manufacturer or by
its technical assistance service or by person
ZLWKHTXLYDOHQWTXDOL¿FDWLRQLQRUGHUWRSUH-
vent any risks.

Other manuals for Rancilio epoca

Related product manuals