13) Check to make sure rails are the correct distance apart at both ends and put on the end log support cross
tube, do not tighten the bolts.
14) Cross measure new rails and adjust
15) When rails are square and level tighten 8 bolts in log support cross tube, mount the centre log support cross
tube and tighten it.
Re check levelness and cross measurements.