EasyManua.ls Logo

Ravas RCS - 8. System Settings Configuration; 8.1 Setting Forklift Capacity; 8.2 Interval Setting Procedure

Ravas RCS
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
4 INSTALLING OR CHANGING BATTERIES
Open the housing.
Systems are supplied with batteries
packed separately.
Your supplier may have installed them.
After message LO-BAT, old batteries
have to be taken out.
Place new batteries.
Watch for the polarity!!!
Close housing

Other manuals for Ravas RCS