RBI Gas boilers - Start-Up Report; Pre-Startup Checklist; Boiler Startup Sequence

RBI Gas boilers
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fi d b b il & h B il M l
Fi
nne
d
co
pp
er tu
b
e gas
b
o
il
ers
&
water
h
eaters –
B
o
il
er
M
anua
l
40
F
F
START-UP REPORT
DATE
JOB NAME:
T
E
C
HNI
C
IAN:
L
OCATION:
CO
MPANY
:
MO
DEL
:
PH
O
NE N
U
MBER
:
S
ERIAL #
:
PRE
-
ST
A
T
T
R
T
U
P
C
HE
C
K
L
I
ST
NO VISIBLE DAMAGE TO UNI
T
INLET AIR FILTER IN
S
TALLED AND
C
LEA
N
P
IPING PROPERLY CONNECTE
D
PROPER SERVICE CLEARANCES PROVIDE
D
B
O
ILER CIRC
U
LAT
O
R WIRE
D
P
UMP RUNNING, HEAT EX
C
HANGER FUL
L
V
ENT
/
STACK C
O
NNECTE
D
GAS LINES PURGED, N
O
LEAKS, N
O
MISSING TEST
P
L U G
S
B
OI
LE
R
ST
A
T
T
R
T
U
P
S
E
Q
U
E
N
C
E
Note: Locate the AA terminals and minimum hold switch in the bottom-right of the electrical panel on the main
HeatNet board. Also locate the manometer test mani
f
old in the bottom o
f
the electrical panel
.
Disable an
y
external call
f
or heat and toggle the remote/local switch to REMOTE
.
1
.
T
oggle the LOW FIRE switch to c y cle the boiler then hold at trial
f
or pilot ignition
.
2
.
S
et pressure to 3–3.5" WC (ame signal should read 5.0 VDC)
.
3.
Release boiler to main ame trial for ignition
.
4
.
C
heck for stable ame
.
5
.
R
ecord combustion and manifold pressure at minimum rin
g
rate.
6.
J
um
p
er the AA terminals to
force 100% input
.
7.
R
ecord combustion and mani
f
old pressure.
8.
R
emove the AA
j
umper to place the boiler at minimum rate
.
9
.
M
ake an
y
nal ad
j
ustments on low
re. 1
0.
C
heck all combustion results using a calibrated
ue gas anal
y
zer
.
11
.
R
e
l
ease t
h
e LOW FIRE switc
h
to p
l
ace
b
oi
l
er in stan
dby.
12
.
In addition to completing the Fusion start-up report, complete the control set-up information in the rear of
the HeatNet manual.

Related product manuals